Friday, April 14, 2017

Blondie, brunettie, the Title

There's three I miss like air
Blondie, brunettie, and the titled heir

Blondie stayed three years past the others
Gave time and friendship, travel and play
But wore baggier shirts and frownier faces each day
Until he finally gave up on her disrespect & went his own way

Brunettie stayed just six months past the first
Gave attention, fun, even seemed like love
Then she rebelled, pulled back from the connection
Worrisome, but seemed she could easily return to harmony
Stays the whole weekend, leaves Sunday night with a hug
But Monday she blabs to the world how he's a thug
All about how awful he treats her, how he's such a toad
Never to be seen or heard again, she hit the road

The Title applied to a person of no love
He couldn't give the slightest recognition of even being present in the room.
Refused all contact, from speaking to playing to even a look
That is, from a kind word, a playful tussle, or that sweet look of love
His person, so cold, never approached that sacred title he bore
To his own detriment, refused love, family, friends, and school - for the whore
By hurting himself, cutting off 80% of his own vitality
He gave pain, reduced those who love him by 20% just from grief
And to his "Norma Bates," he showed all them what's what


Thursday, April 13, 2017

Che Stat, shoddy finish, good structural

To summarize: it's veering off track, you get a feeling of disrespect as you walk the site.  There's cig butts strewn about, beer cans, chunks of foam, burned boards just laying around.  Yes, there's underground pipe, but no attempt has been made to smooth out the lawn, or really even to cover the trench.  At least 50% of the trench sits open day after day, with nary a comment from the foreman, as if that's how all underground jobs are supposed to be, half finished.  Then, down by the downlake cab, there's dirt thrown over the hillside, on top of wood piles, on the shrubs, against the building.  Then the foreman sends the machine back, like "We're good, no more dirt work needed."

Next you take a look inside the conduit, is the wire inside?  Is it the right size?  Nope, no wire, There's a roll in the yard, maybe they're going to use it, but it's one size too small..?  Do they care?

Moving inside, the front door looks nice, until you see that it has no knob, no strike plate, doesn't close properly, and the built-in blind doesn't work.  Because it doesn't close properly, rain gets into the building and swells the floor.  It'll be moldy soon in there.  The drawing shows two side windows, but the foreman only installed one.  It specifies bug proof, air tight walls.  They used very porous construction technique of wood "wainscoat" walls and ceiling, with large 3/4" gaps at all inside corners, then blew oceans of foam into all the gaps, which of course are ballooning out everywhere, while leaving multitudes of holes like swiss cheese into the wall cavities.  So there will be bugs, lots of bugs, and probably mice and rats.

Moving on to the plumbing, that's good right?  No.  There's no hot water to the bathroom sink.  No water heater, the kitchen sink drain is jammed into the toilet drain with a home-made gasket, not a fitting.  The kitchen drain is not vented, so it'll gurgle.  And it's in the floor, not the wall, so you can't add a bubble-vent easily except maybe inside the cabinet.

He says it's insulated, but who knows.  If it's the same quality as the rest of the work, probably not done well or even right.

Overall it's shoddy work, disrespectful to me, not worth much.  Will need lots of rework.  Throw this guy out, quick.

Rating by sub-job:
  Structural: 9
  Framing: 8
  Dock deck: 8
  Plumbing: 6
  Ceiling: 8
  Insulation: 5
  Walls: 3
  Doors: 3
  Dirt work: 2
  Electrical: 2
  Following directions: 2
  Attention to detail: 1
  Respect: 1